Project Scope

DCC has performed multiple Design-Build projects for Bard Manufacturing in Madison, GA. The first addition was assembling and warehouse space with a large employee parking lot. The new employee parking lot had 300 spaces. The New Manufacturing building addition was intended to support the new government mandated refrigerant change over.

Market

Industrial

Services Provided

Design Build, New Construction, Pre-Construction, Renovation, Jurisdictional Coordination, Risk Management, Miscellaneous Steel Fabrication

Total Size

107,200 sq ft

Delivery Method

Design-Build

Duration

16 Months

Challenge

Both projects encountered unsuitable soils and groundwater such that special provisions had to be considered. The New Manufacturing building was actually built where a jurisdictional waterway used to reside.

Solution

A portion of the site had to use soil cement to stabalize subsurface conditions. The jurisdictional waterway needed Army Corp of Engineers approval and the waterway had to be re-routed while a new storm system was installed to handle it.

Blockquote
We’ve partnered with Dublin Construction Company on several building expansion projects, and they have consistently exceeded our expectations. Their team brings a high level of professionalism, reliability, and technical expertise to every job. From early planning through project completion, they communicate clearly, stay on schedule, and are always easy to work with. Their ability to manage complex expansions with minimal disruption to our operations has been especially valuable. We highly recommend them for any commercial construction needs.
Isaiah Evans

Mfg. Controls Engineer Bard Manufacturing Company, Inc.

Let’s Start Building

Let contact img (1)

    Other Projects