The Gro Tec Facility in Eatonton, GA, a Pennington Seed Co., Inc. subsidiary, produces numerous custom fertilizer blends for Walmart, Home Depot, Lowe’s, and others. This blending system for Gro Tec has been operational since 1993 and required a complete rebuild.
In conjunction with the Sackett Waconia Equipment Supplier, DC initiated the design and procurement of equipment necessary to replace the original blend system fully in February. After several planning and design meetings, the team successfully had all the stainless-steel equipment and materials on-site by September and ready for shutdown. The existing blend tower, blend equipment, complete electrical power, control systems, air, and all ancillary utilities were removed. New equipment arrived on-site and was installed and became operational within six weeks of the shutdown date, running 24 hours a day. The system has been operational since then, producing with the required blend accuracy and capacity.
Industrial
Design Services and Renovations
60,000 sq ft
Design-Build
6 Weeks
Dublin Construction Co., Inc. has provided design and construction services for Pennington Seed Co., Inc. in Madison, Georgia, since the mid-1980s. Their latest project was a complete design-build shutdown for a fertilizer blending operation in Eatonton, GA, which was completed in six weeks. That same year, a new 75,000 sq. ft. seed warehouse was constructed for the Penn Pak Division in Madison. Dublin Construction consistently exceeded expectations.