Provided design and build upgrade for the Varn Woods Pellet Mill operation in Hoboken, Georgia. The upgrade consisted of concrete foundation work for new mill equipment, the installation of a rotary drum wood dryer, a gas-fired heat source, a product silo, conveyor systems, a new hammer mill, and two new pellet mills.
Industrial
New Construction, Occupied, Renovation, Operational
62,000 sq ft
Design-Build
7 Months